Your First point of contact for all your Heat Pump & electrical needs

Renovations & New Builds

Electrician using a screwdriver to fit a double power point on a freshly plastered white wall

House Rewiring, Renovation and New Build Electrician Auckland

Swap a power point, sure, any sparky can do that. Rewiring a 1920s villa is a different trade, and that's where a proper renovation electrician earns the name.

Wire a new build in Albany and you're starting from a bare frame with a blank switchboard. First Point has worked both ends since 2009, from our base on Stoddard Road in Mount Roskill.

Renovation Electrician and House Rewiring for Older Auckland Homes

Open up an Auckland villa or bungalow built before 1960 and you'll usually find VIR or TRS cable. That rubber goes brittle (some of it crumbles in your hand) and was never meant to run an induction hob and a heat pump. House rewiring fixes that: out with the old cabling, switchboard and safety devices, in with a system built to AS/NZS 3000:2018.

Then there's the Special Character Areas overlay, which protects these homes from demolition in suburbs like Ponsonby, Grey Lynn, Mt Eden and Epsom. Great for the streets. Tougher for us. Cable has to go through original lath-and-plaster or tongue-and-groove linings you can't cut and patch like a 1990s gib wall. So electrical renovations here take longer and need more thought.

Old switchboards need care too. Many older fuse boxes sit on asbestos-containing backing boards, so we treat any original board as asbestos until it's proven otherwise and plan its removal into the rewire, not halfway through it.

Our Epsom job is a good example. A five-bedroom home needed a switchboard upgrade and new wiring alongside a rear extension built with Skeates Building Co, and the owners lived there throughout. We kept their hot water, lighting and appliances running the whole way. It’s one of several projects in our electrician case studies.

New Build Electrician and New Build Electrical Wiring

A new build electrician designs and installs a home's entire electrical system from the framing stage. Switchboard, circuits, data cabling and any smart-home wiring, before the code compliance certificate is issued. This is where new build electrical Auckland projects differ most from renovation work.

No old wiring to strip out, but no room for guesswork either, since every cable run gets sealed inside the walls before the plasterers arrive.

We work through switch, lighting and power positions with you on the plans, then rough in EV charger cabling and heat pump circuits at framing stage, when it costs a fraction of a later retrofit. Peter brought us in to plan the electrical layout for his new build and credited Sam with "smart electrical design and logical positioning of switches." Our new build electricians in Auckland are the same team handling the renovation side.

Cables coming out of a wall box on a green and white wall, ready for fitting off

Why Auckland Renovators and Builders Choose First Point

Sam Martin started First Point Electrical as a one-man band in September 2009 and has more than 25 years in the trade. Today it's a team of Certified Master Electricians and ECANZ members working across Auckland, from Ponsonby to Papatoetoe.

Choosing a home renovation electrician comes down to proof. We hold 99.5% approval on NoCowboys from 37 authenticated ratings. Every job carries our money-back guarantee and lifetime warranty, backed by public liability insurance.

Ready to talk rewiring or new build wiring? Call 0508 947 363 or request a free quote.

Frequently Asked Questions

Ceramic fuses instead of circuit breakers, power points that feel warm or have gone brown, lights dimming when the kettle goes on, a burning smell you can’t trace, or breakers tripping for no reason. If your home was built before 1960 and still has original VIR or TRS cable, get it inspected anyway.

Most full rewires of a three or four bedroom Auckland home cost between $5000-$12,000. Villas and bungalows in the character suburbs sit nearer the top, because original linings take longer to work around. We’ll give you a written quote after a site visit.

Usually 3 days to 1 week for a three or four bedroom home, and longer for a villa with original lath-and-plaster walls. You can generally stay living in the house. Our Epsom clients did, and we kept their hot water, lighting and appliances running throughout.

No. A house rewiring job on its own doesn’t need building consent. It does need a Certificate of Compliance and an Electrical Safety Certificate from us, plus an independent Record of Inspection if new mains are involved. You’ll get copies of all of them, so keep them with the house.

Everything from the switchboard out. That means RCD protection as AS/NZS 3000:2018 requires, wiring to every outlet and fixed appliance, interconnected smoke alarms, EV charger and heat pump provisioning, and data or smart-home cabling if you want it. Planning it at framing stage costs far less than retrofitting later.

Council doesn’t inspect the wiring itself. It asks for our electrical certificates when your builder applies for the Code Compliance Certificate, and it can refuse the CCC without them. As your new build electrician, we plan that paperwork into the build so it’s never the hold-up.

Yes, and we’d recommend it. On our Epsom project, the same team upgraded the switchboard, wired the rear extension and integrated a Daikin ducted heat pump across the old and new sections. Everything runs from one switchboard, not two systems that need reconciling later.